I have an existing 7400 2 Nodes 4 Shelves.
We found out that Node 1 DP-1 and DP-2 is interchanged.
Node 0 cabling is correct.
Can we simply change DP-1 to DP-2 and DP-2 to DP-1 ?
Thanks for your input.
Regards
Alex
Re-Cabling HP 3PAR
Re: Re-Cabling HP 3PAR
LFF, SFF or mixed shelves??
You check cabling guide a,b or c?
You check cabling guide a,b or c?
Re: Re-Cabling HP 3PAR
Only SFF.
I check Best Practice Guide attached.
Regards,
Alex
I check Best Practice Guide attached.
Regards,
Alex
- Attachments
-
- cabling_7400_sff.pdf
- (5.71 MiB) Downloaded 1225 times
HP MASTER ASE STORAGE
Re: Re-Cabling HP 3PAR
AFAIR if all cabling for 4s system like in guide you can simply change DP-1 to DP-2 and DP-2 to DP-1.