Hi dears
New 3PAR 7400 4 Node assembled on a rack .
interconnect cables between Enclosures has been done But nothing doing about interconnect cables between Nodes (A & C).
Today an idiot powered on all enclosures and Nodes(even not correct order) .
consider No configuration.(Nothing till now)
Now what do i have to do ?
- power off all enclosures , complete cabling and powering on in correct order
or
- while it is powering on , attach cabling between interconnect Nodes and complete cabling (Not powering off)
Any suggestion ? (please DO NOT consider calling HP)
Not complete Cabaling and power on
Not complete Cabaling and power on
Last edited by chanchon on Wed May 07, 2014 1:05 am, edited 1 time in total.
Re: URGENT***Not complete Cabaling and power on****URGENT
I am not expert, but I don't think it is a huge deal, nothing is configured yet. At worst case the nodes will have a bunch of alerts. 2 options are wait for HP to get onsite and then have them serial in and cleanly shut down nodes or just power off.
Re: URGENT***Not complete Cabaling and power on****URGENT
If the 7400 has no configuration (OOTB has not been run) then you can power it off, re cable, power on and run OOTB.